본문 바로가기
Samsung C&T T&I Fashion Resort
close
close

Businesses

close

Occupational Health and Safety Management System(Samsung OHSMS)
Systematic management activities to prevent accidents at construction sites

  • PLAN
    Together with all head office/business units/PJT/subcontractors, we establish consistent safety and health policies and key plans.
  • DO
    We scrupulously observe and perform all work standards/processes relating to the safety and health of ourselves and others.
  • CHECK
    We conduct a safety audit to check whether safety and health rules and practices are thoroughly complied with or implemented accordingly.
  • ACTION
    We actively make continuous efforts to improve safety procedures to create a safe workplace

Samsung OHSMS Basic Flow

삼성 OHSMS 기본 Flow 전사, 사업부, 현장으로 구분

Intensive Management of High Risk Works

Top-down OHSMS Core System for the Eradication of Serious Accidents - A system that selects high risk works as designated hazardous work and intensively manages them according to the management process.

삼성 OHSMS 기본 Flow 전사, 사업부, 현장으로 구분

Samsung OHSMS High Risk Work

Head office pre-approval work [work that requires technical review by the head office] - Technical review/pre-approval of related departments before starting work and essential inspection before, during, and after work.

  • Assembly and dismantlement of scaffolding (Height of 31m or more, suspended frame scaffold, irregular scaffold of 10m or more, etc.)
  • Tower crane installation·lifting·dismantlement
  • Pile driver and pile drawer assembling·dismantling·changing·moving work
  • Shoring system/slab/composite wall/gang formwork (install the shoring system over 5m, pour concrete, and install gang form over 5m)
  • Temporary assembly of irregular structure (curved PC beam, segmented arch bridge, curved box girder bridge)
  • Installation·dismantlement of temporary soundproof walls over 12m
  • Mobile crane work(lifting load 20ton, height 50m or more, complex lifting, installation·dismantlement of auxiliary boom)
  • Excavation work(a pipeline of 1.5m or more, a retaining wall of 10m or more, pile cutting for piles with more than 1.5m, and single footing)
  • Installation·dismantlement of construction lift
  • Construction Facility (ACS / RCS / slip form, bridge manufacturing facility)
  • Installation·dismantlement·maintenance of grating
  • Dismantlement work
  • Dismantlement and removal of asbestos
  • Diaphragm wall work with vertical reinforcement of 7m or more