본문 바로가기
Samsung C&T T&I Fashion Resort
close
close

Businesses

close

Yongsan cleanup project

Water Infrastructure Korea

2010.06.25 ~ 2019.12.31

Feature: Soil Washing : 36,239 m³, Soil Washing : 36,239 m³

Decription: Repairing environment through treatment of contaminated soil ground water



[Soil groundwater remedial/demolition/waste removal ]



- Location: Seoul, Korea

- On-site Soil Remediation

- Soil Washing : 257,619 m³

- Off-site Soil Remediation

- Soil Washing : 36,239 m³

- c- Thermal Desorption : 64,769 m³

- Groundwater Remediation

- Waste Water Treatment : 1,700 t/d

- Pre-Stabilization

- Bioslurping Technology : 460.8 m³/h (High Vacuum Dual Phase SVE System)