Water Infrastructure Korea
2005.06.01 ~ 2009.06.01
Feature: Purification Facility Construction(potable) : 1 building 350,000m3/day
Decription: Receiving Well(2ea), Coagulation Basin(10ea)
[Water work]
- Location: Gyeonggi-do, Ilsan
- Advanced water treatment Ozon Reactive Basin(2ea), Active Carbon Fitter Basin(20ea)
- Purification Facility Construction(potable) : 1 building 350,000m3/day
- Receiving Well(2ea), Coagulation Basin(10ea)
- Chemical Sedimentation Basin(10ea), Filter Basin(20ea)
- Clean Water Reservior(2ea, CT-Tank),
- Clean Water Reservior(4ea), Equalizing, Reservoir(2ea)
- Sludge Thickener(4ea), Dewatering Basin(2ea)
- Reverse Dewatering Basin(2ea)