UAE Salam Underpass

Road and Railway Overseas

2008.05.01 ~ 2012.12.01

Feature: CUT & COVER TUNNEL 2.4km
Decription: DEPRESSED ROAD, ACCESS ROAD 1.2km

[Road/way]
Design & Build

Total Length L : 3.6km (8 Lanes)
Construction Method : D/Wall, PC-Beam
Tunnel : 2.4km (Cut&Cover)
Depressed Road, Access Road : 1.2km
Utility Relocation : Water Pipe, Rainwater Pipe, Power Line
M&E : Ventilation/Fire Facility, TCS/SCADA etc.