Go to the Contents

Global Network Our Worldwide Network

You can view detailed information on Samsung C&T project if you click an area of interest below.

UAE

TOP
UAE Nuclear Power Plants

UAE Nuclear Power Plants

  • - ProjectPlant
  • - Duration2010. 3 ~ 2020. 5
  • - OutlineCapacity: 1400MW X 4units
UAE Salam Tunnel

UAE Salam Tunnel

  • - ProjectCivil
  • - Duration2008. 5 ~
  • - OutlineTotal Length 3.6km(8lanes) | Tunnel Length 2.4km
CCAD(Cleveland Clinic)

CCAD(Cleveland Clinic)

  • - ProjectBuilding
  • - Duration2010 ~ 2013
  • - OutlineHospital room: 364rooms | Parking lot: 3,100Vehicles | Doctor’s office: 342rooms
UAE DTSS T01

UAE DTSS T01

  • - ProjectCivil
  • - Duration2011. 3 ~ 2014. 10
  • - OutlineDeep sewage tunnel (TBM) L=16.1km, D=4.0m
UAE Emal Phase 2 CCPP

UAE Emal Phase 2 CCPP

  • - ProjectPlant
  • - Duration2011. 9 ~ 2014. 6
  • - OutlineCapacity: 1,023MW

Mongolia

TOP
Shangri-La Hotel

Shangri-La Hotel

  • - ProjectBuilding
  • - Duration2012. 6 ~ 2015. 8
  • - Outline24Floor Office 1unit | 34Floor Hotel 1unit | 5Floor Retail/Theater 1unit |
    Basement 2Floor garage

Hongkong

TOP
Hongkong Subway C1109

Hongkong Subway C1109

  • - ProjectCivil
  • - Duration2012. 8 ~ 2018. 4
  • - OutlineLength 2.2kmSubway, 2 stations

Singapore

TOP
Singapore SLNG Terminal

Singapore SLNG Terminal

  • - ProjectPlant
  • - Duration2010. 2 ~ 2014. 1
  • - Outline3 mil. tons/year LNG receiving terminal (terminal size includes jetty)
    180,000-cubic-meter LNG tanks x 3 (surface type, full containment type)
SLNG Secondary berth

SLNG Secondary berth

  • - ProjectCivil
  • - Duration2011. 8 ~ 2014. 1
  • - OutlineJetty (2 locations): 2st-350m, 3st-400m | Dredge 1,2 mil. cubic meters pier 540m,
    ground foundation improvement | Loading Arm 4, LNG piping 50,000 DI
Suntec City A&A

Suntec City A&A

  • - ProjectBuilding
  • - Duration2012. 6 ~ 2014. 9
  • - OutlineCapacity: Office Tower 5units | Shopping mall, Convention Center
Connexion

Connexion

  • - ProjectBuilding
  • - Duration2010 ~ 2013
  • - Outline20Floor | Clinics (189 Units / Level 7~16) | Hospital (116 Beds / Level 7~10)
    Hotel (223 Rooms / Level 11~20) | Podium : Hospital (Level 2~5)
    Lobby, Retails, Car park, Swimming Pool, Common Facilities (Level 1~6)
Singapore GMR CCPP

Singapore GMR CCPP

  • - ProjectPlant
  • - Duration2011. 4 ~ 2013. 12
  • - OutlineCapacity: 800MW
UIC

UIC

  • - ProjectBuilding
  • - Duration
  • - Outline

Indonesia

TOP
IFC2

IFC2

  • - ProjectBuilding
  • - Duration2012. 10 ~ 2015. 4
  • - Outline49Floor

India

TOP
Worli Tower

Worli Tower

  • - ProjectBuilding
  • - Duration
  • - Outline

America

TOP
Austin(A2 PJT) Complex

Austin(A2 PJT) Complex

  • - ProjectBuilding
  • - Duration1996. 5 ~
  • - OutlineSite Area: 1155000㎡, semiconductor manufacturing factory

Saudi Arabia

TOP
Saudi Qurayyah IPP

Saudi Qurayyah IPP

  • - ProjectPlant
  • - Duration2011. 10 ~ 2014. 6
  • - OutlineCapacity: 4,000MW
Riyadh Metro Pkg.3

Riyadh Metro Pkg.3

  • - ProjectCivil
  • - Duration2013. 9 ~ 2018. 8
  • - OutlineTotal Length 64.5km(3 Metro lines)
Rabigh II PJT

Rabigh II PJT

  • - ProjectPlant
  • - Duration2013.12~2017.6
  • - Outline2100MW combined-cycle gas-fired powered plant

Vietnam

TOP
Son Duong Port

Son Duong Port

  • - ProjectCivil
  • - Duration2011. 9 ~ 2017. 4
  • - OutlineProject to build a total of 8.2 kilometers including seawalls and a pier
    (303 caissons)

Qatar

TOP
Lusail CP3A Bridge

Lusail CP3A Bridge

  • - ProjectCivil
  • - Duration2011. 11 ~ 2013. 11
  • - OutlineTotalLength : 951.5m (Con'c Box Girder: 561.5m, Suspension Bridge: 390.0m)
Lusail CP5B Road

Lusail CP5B Road

  • - ProjectCivil
  • - Duration2012. 1 ~ 2014. 7
  • - OutlineTotal length: 10.721km | A1 & A2: two-way 8 lanes | D2 & D3: two-way 4 lanes

Australia

TOP
Roy Hill PJT

Roy Hill PJT

  • - ProjectCivil
  • - Duration2013. 4 ~ 2015. 11
  • - OutlineIron ore processing plant and transportation facilities

Algeria

TOP
Mostaganem and Nama Power plant

Mostaganem and Nama Power plant

  • - ProjectPlant
  • - Duration2014.2 ~ 2017.8
  • - Outline1,450MW and 1,163MW combined-cycle power plant